OSI PI TO Tempo MES Integration Discovery Document
- 更新日 11 Nov 2025
- 3 読む分
- 印刷する
- 闇光
Client: [Client Name]
Date: [Date]
Prepared by: ApprenticeFS
Participants: [List attendees]
EXECUTIVE SUMMARY
This document captures the technical and business requirements for integrating OSI PI (AVEVA PI System) with Tempo MES. The information gathered will inform the integration architecture, project scope, timeline, and implementation approach.
- CURRENT OSI PI INFRASTRUCTURE
1.1 System Configuration
What version of OSI PI (AVEVA PI System) are you currently running?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
How many PI servers (DA and AF) do you have, and what's the architecture (centralized vs distributed)?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
1.3 System Ownership
Who currently manages your PI system (IT, automation team, operations, etc.)?
Response: ______________________________________________________________________
Primary Contact: ________________________________________________________________
Notes: ________________________________________________________________________
- DATA SCOPE & REQUIREMENTS
2.1 Equipment & Data Points
Which equipment/production lines need to connect to Tempo MES through PI?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
What specific data points (tags) need to flow to Tempo (process values, alarms, events)?
Response: ______________________________________________________________________
Estimated tag count: ____________________________________________________________
Notes: ________________________________________________________________________
2.2 Data Flow & Frequency
Are there specific process parameters critical for batch records or genealogy tracking?
Response: ______________________________________________________________________
Examples: ______________________________________________________________________
Notes: ________________________________________________________________________
2.3 Bidirectional Communication
Do you need bidirectional data flow (writing setpoints or commands back to PI)?
Response: ______________________________________________________________________
Use cases: _____________________________________________________________________
Notes: ________________________________________________________________________
- INTEGRATION ARCHITECTURE
3.2 Network & Security
Are there network segmentation or firewall considerations between where the PI Web API resides and Tempo?
Response: ______________________________________________________________________
Network diagram available: [ ] Yes [ ] No
Notes: ________________________________________________________________________
3.3 Additional Systems
Do you have OPC UA servers configured in addition to PI?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
Are there other systems (LIMS, ERP, DeltaV) that also interface with PI?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
- USE CASES & BUSINESS OBJECTIVES
4.1 Primary Drivers
What's the primary driver for this integration?
[ ] Real-time process monitoring
[ ] Automated batch record generation
[ ] Advanced analytics and trending
[ ] Regulatory compliance documentation
[ ] OEE calculations
[ ] Other: _____________________________________________________________________
4.2 Tempo MES Integration
Will PI data support Config Lock/PQ execution scenarios in Tempo?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
Do you need PI data for OEE calculations, genealogy, or compliance documentation?
Response: ______________________________________________________________________
Specific requirements: __________________________________________________________
Notes: ________________________________________________________________________
4.4 Regulatory Requirements
Are there specific regulatory requirements driving real-time data capture (PAT, CPV, continuous verification)?
Response: ______________________________________________________________________
Regulatory framework: [ ] FDA [ ] EMA [ ] Other: ___________________________
Notes: ________________________________________________________________________
- DATA GOVERNANCE & COMPLIANCE
5.1 Data Retention
What's your data retention policy for PI data vs Tempo batch records?
PI retention: __________________________________________________________________
Tempo retention: _______________________________________________________________
Notes: ________________________________________________________________________
6.3 Environment Strategy
What's your planned approach for development, test, and production environments?
Development: ___________________________________________________________________
Test/Validation: _______________________________________________________________
Production: ____________________________________________________________________
Notes: ________________________________________________________________________
6.4 Data Standards
Do you have documented PI tag naming conventions and standards?
Response: ______________________________________________________________________
Documentation available: [ ] Yes [ ] No
Notes: ________________________________________________________________________
- PROJECT LOGISTICS
7.1 Resources & Governance
Do you have dedicated resources for PI system configuration support?
Name/Role: _____________________________________________________________________
Availability: __________________________________________________________________
Notes: ________________________________________________________________________
What's your change control process for PI system modifications?
Response: ______________________________________________________________________
Approval timeline: _____________________________________________________________
Notes: ________________________________________________________________________
7.2 System Changes
Are there planned PI upgrades that could impact the integration timeline?
Response: ______________________________________________________________________
Planned date: __________________________________________________________________
Notes: ________________________________________________________________________
7.3 Stakeholder Alignment
Who are the key stakeholders from both the PI and MES sides?
PI System:
Name: ________________________________ Role: __________________________________
Name: ________________________________ Role: __________________________________
MES/Operations:
Name: ________________________________ Role: __________________________________
Name: ________________________________ Role: __________________________________
IT/Infrastructure:
Name: ________________________________ Role: __________________________________
Name: ________________________________ Role: __________________________________
- ADDITIONAL INFORMATION
8.1 Known Challenges or Constraints
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
8.2 Integration Timeline Expectations
Target completion date: _________________________________________________________
Critical milestones: ____________________________________________________________
Notes: ________________________________________________________________________
8.3 Success Criteria
What would make this integration successful?
Response: ______________________________________________________________________
Notes: ________________________________________________________________________
- NEXT STEPS
ACTION ITEMS:
[ ] Review and complete all sections of this discovery document
[ ] Obtain PI system architecture diagrams and documentation
[ ] Schedule technical deep-dive with PI administrators
[ ] Identify test environment availability
[ ] Review and provide network/security documentation
[ ] Other: _____________________________________________________________________
FOLLOW-UP MEETING:
Date/Time: _____________________________________________________________________
Participants: __________________________________________________________________
Agenda: ________________________________________________________________________
DOCUMENT CONTROL
Version Date Author Changes
1.0 [Date] ApprenticeFS Initial draft
DISTRIBUTION:
[Name/Role]
[Name/Role]
This document is confidential and proprietary to ApprenticeFS and [Client Name]